{"id":2599,"date":"2025-07-23T13:34:59","date_gmt":"2025-07-23T10:34:59","guid":{"rendered":"https:\/\/west-oil.kz\/?p=2599"},"modified":"2025-08-11T15:46:11","modified_gmt":"2025-08-11T12:46:11","slug":"sistema-izmerenii-kolichestva-i-kachestva-nefti-sikn","status":"publish","type":"post","link":"https:\/\/west-oil.kz\/en\/realizovannye-proekty\/sistema-izmerenii-kolichestva-i-kachestva-nefti-sikn\/","title":{"rendered":"System for measurement of oil quantity and quality (SMOQQ)"},"content":{"rendered":"\n<div class=\"wp-block-group left-image has-global-padding is-layout-constrained wp-container-core-group-is-layout-7db9d80f wp-block-group-is-layout-constrained\" style=\"padding-right:0;padding-left:0\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column period-realizacii is-layout-flow wp-block-column-is-layout-flow\">\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Year: <strong>2025<\/strong><\/p>\n\n\n\n<p>Implementation period: <strong>10<\/strong> <strong>months.<\/strong><\/p>\n<\/blockquote>\n<\/div>\n\n\n\n<div class=\"wp-block-column opisanie-proekta is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">System for measurement of oil quantity and quality (SMOQQ)<\/h2>\n\n\n\n<p>for ZHALGIZTOBEMUNAY LLP<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Location area:<\/td><td>Kazakhstan, Mangistau region<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Scope of works:<\/td><td>Development of technical solution; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Brands that were used:<\/td><td>Emerson, Parker, Wika.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>The operator&#8217;s room provided solutions to the following customer tasks:<\/td><td>Determining of mass flow rate of oil; Determining of volumetric flow rate of oil; Determining of oil density; Determining of moisture content in oil; Conducting control of metrological characteristics of Coriolis flowmeters using a stationary piston-tube verification unit (PTVU); Verification of a stationary PTVU using a reference unit (RU); Registration, storage and transmission of information to the telemetry system and SCADA.<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"902\" height=\"585\" src=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr2-1.jpg\" alt=\"\" class=\"wp-image-2600\" srcset=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr2-1.jpg 902w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr2-1-472x306.jpg 472w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr2-1-768x498.jpg 768w\" sizes=\"auto, (max-width: 902px) 100vw, 902px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Year: 2025 Implementation period: 10 months. System for measurement of oil quantity and quality (SMOQQ) for ZHALGIZTOBEMUNAY LLP Location area: Kazakhstan, Mangistau region Scope of works: Development of technical solution; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system. Brands that were used: Emerson, Parker, Wika. The operator&#8217;s room provided [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2600,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"single-realizovannye-proekty","format":"standard","meta":{"pgc_sgb_lightbox_settings":"","footnotes":""},"categories":[8],"tags":[],"class_list":["post-2599","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-realizovannye-proekty"],"_links":{"self":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2599","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/comments?post=2599"}],"version-history":[{"count":7,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2599\/revisions"}],"predecessor-version":[{"id":2860,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2599\/revisions\/2860"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media\/2600"}],"wp:attachment":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media?parent=2599"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/categories?post=2599"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/tags?post=2599"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}