{"id":2578,"date":"2025-07-23T11:32:08","date_gmt":"2025-07-23T08:32:08","guid":{"rendered":"https:\/\/west-oil.kz\/?p=2578"},"modified":"2025-08-12T10:31:40","modified_gmt":"2025-08-12T07:31:40","slug":"modernizaciya-sredstv-izmereniya-uzlov-ucheta-gaza-tec-1-tec-2-i-tes-1-i-etap","status":"publish","type":"post","link":"https:\/\/west-oil.kz\/en\/realizovannye-proekty\/modernizaciya-sredstv-izmereniya-uzlov-ucheta-gaza-tec-1-tec-2-i-tes-1-i-etap\/","title":{"rendered":"Modernization of measuring instruments of TPP-1, TPP-2 and TPS gas metering units (1st stage)"},"content":{"rendered":"\n<div class=\"wp-block-group right-image has-global-padding is-layout-constrained wp-container-core-group-is-layout-bc757ebe wp-block-group-is-layout-constrained\" style=\"padding-right:0;padding-left:0\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-04822461 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column opisanie-proekta is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Modernization of measuring instruments of TPP-1, TPP-2 and TPS gas metering units (1st stage)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">for Mangistau Nuclear Power Plant LLP<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Location area:<\/td><td>Kazakhstan, Mangistau region, Aktau.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Scope of works:<\/td><td>Development of technical solution; Detailed design; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Brands that were used:<\/td><td>Siemens, Emerson,  \u041f\u043e\u0441\u0442\u0440\u043e\u0435\u043d\u0438\u0435 \u0441\u0438\u0441\u0442\u0435\u043c SCADA<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>The system provided solutions to the following customer tasks:<\/td><td>Determination of volumetric flow rate of natural gas; Registration, storage and transmission of information to the telemetry system and SCADA.<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column period-realizacii is-layout-flow wp-block-column-is-layout-flow\">\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Year: <strong>2024<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Implementation period: <strong>12<\/strong> <strong>months.<\/strong><\/p>\n<\/blockquote>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1660\" src=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr5-scaled.jpg\" alt=\"\" class=\"wp-image-2579\" srcset=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr5-scaled.jpg 2560w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr5-472x306.jpg 472w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr5-1024x664.jpg 1024w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr5-768x498.jpg 768w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr5-1536x996.jpg 1536w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr5-2048x1328.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Modernization of measuring instruments of TPP-1, TPP-2 and TPS gas metering units (1st stage) for Mangistau Nuclear Power Plant LLP Location area: Kazakhstan, Mangistau region, Aktau. Scope of works: Development of technical solution; Detailed design; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system. Brands that were used: Siemens, Emerson, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2579,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"single-realizovannye-proekty","format":"standard","meta":{"pgc_sgb_lightbox_settings":"","footnotes":""},"categories":[8],"tags":[],"class_list":["post-2578","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-realizovannye-proekty"],"_links":{"self":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2578","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/comments?post=2578"}],"version-history":[{"count":5,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2578\/revisions"}],"predecessor-version":[{"id":2876,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2578\/revisions\/2876"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media\/2579"}],"wp:attachment":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media?parent=2578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/categories?post=2578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/tags?post=2578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}