{"id":2566,"date":"2025-07-23T10:54:25","date_gmt":"2025-07-23T07:54:25","guid":{"rendered":"https:\/\/west-oil.kz\/?p=2566"},"modified":"2025-08-12T12:12:14","modified_gmt":"2025-08-12T09:12:14","slug":"proektirovanie-i-proizvodstvo-agzu-s-sistemoi-teleizmerenii-2","status":"publish","type":"post","link":"https:\/\/west-oil.kz\/en\/realizovannye-proekty\/proektirovanie-i-proizvodstvo-agzu-s-sistemoi-teleizmerenii-2\/","title":{"rendered":"Automated group metering unit (AGMU)"},"content":{"rendered":"\n<div class=\"wp-block-group right-image has-global-padding is-layout-constrained wp-container-core-group-is-layout-bc757ebe wp-block-group-is-layout-constrained\" style=\"padding-right:0;padding-left:0\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-04822461 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column opisanie-proekta is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Automated group metering unit (AGMU)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">18 units of AGMU direct contract with Embamunaigas JSC<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Location area:<\/td><td>Kazakhstan, Atyrau region, Dossormunaigas Oil and Gas Production Authority,<br>Zhylyoimunaigas Oil and Gas Production Authority<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Scope of works:<\/td><td>Development of technical solution; Detailed design; Equipment supply; Engineering; Installation and commissioning; System commissioning.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Brands that were used:<\/td><td>KROHNE, Schneider, Electric, Wika.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>The system provided solutions to the following customer tasks:<\/td><td>Determination of mass flow rate of gas and oil emulsion; Determination of volumetric flow rate of gas and oil emulsion; Determination of pressure, temperature, density; Conversion, storage and visualization of the listed parameters.<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column period-realizacii is-layout-flow wp-block-column-is-layout-flow\">\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Year: <strong>2024<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Implementation period: <strong>3<\/strong> <strong>years.<\/strong><\/p>\n<\/blockquote>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1660\" src=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr7-scaled.jpg\" alt=\"\" class=\"wp-image-2567\" srcset=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr7-scaled.jpg 2560w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr7-472x306.jpg 472w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr7-1024x664.jpg 1024w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr7-768x498.jpg 768w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr7-1536x996.jpg 1536w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr7-2048x1328.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Automated group metering unit (AGMU) 18 units of AGMU direct contract with Embamunaigas JSC Location area: Kazakhstan, Atyrau region, Dossormunaigas Oil and Gas Production Authority,Zhylyoimunaigas Oil and Gas Production Authority Scope of works: Development of technical solution; Detailed design; Equipment supply; Engineering; Installation and commissioning; System commissioning. Brands that were used: KROHNE, Schneider, Electric, Wika. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2567,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"single-realizovannye-proekty","format":"standard","meta":{"pgc_sgb_lightbox_settings":"","footnotes":""},"categories":[8],"tags":[],"class_list":["post-2566","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-realizovannye-proekty"],"_links":{"self":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/comments?post=2566"}],"version-history":[{"count":5,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2566\/revisions"}],"predecessor-version":[{"id":2896,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2566\/revisions\/2896"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media\/2567"}],"wp:attachment":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media?parent=2566"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/categories?post=2566"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/tags?post=2566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}