{"id":2559,"date":"2025-07-23T10:34:13","date_gmt":"2025-07-23T07:34:13","guid":{"rendered":"https:\/\/west-oil.kz\/?p=2559"},"modified":"2025-08-12T12:02:33","modified_gmt":"2025-08-12T09:02:33","slug":"rekonstrukciya-oborotnogo-vodosnabzhe","status":"publish","type":"post","link":"https:\/\/west-oil.kz\/en\/realizovannye-proekty\/rekonstrukciya-oborotnogo-vodosnabzhe\/","title":{"rendered":"Reconstruction of the circulating water supply system in terms of replacing the cooling tower"},"content":{"rendered":"\n<div class=\"wp-block-group left-image has-global-padding is-layout-constrained wp-container-core-group-is-layout-bc757ebe wp-block-group-is-layout-constrained\" style=\"padding-right:0;padding-left:0\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-04822461 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column period-realizacii is-layout-flow wp-block-column-is-layout-flow\">\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Year: <strong>2022<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Implementation period: <strong>14<\/strong> <strong>months.<\/strong><\/p>\n<\/blockquote>\n<\/div>\n\n\n\n<div class=\"wp-block-column opisanie-proekta is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Reconstruction of the circulating water supply system in terms of replacing the cooling tower<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">for Uralskaya TPP of Zhaiykteploenergo JSC through the request of the Department of Housing and Public Utilities, Passenger Transport and Highways of Uralsk State Institution<\/p>\n\n\n\n<figure class=\"wp-block-table d-none\"><table class=\"has-fixed-layout\"><tbody><tr><td>Location area:<\/td><td>Kazakhstan, Mangistau region<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table d-none\"><table class=\"has-fixed-layout\"><tbody><tr><td>Scope of works:<\/td><td>Development of technical solution; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table d-none\"><table class=\"has-fixed-layout\"><tbody><tr><td>Brands that were used:<\/td><td>Emerson, Parker, Wika.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table d-none\"><table class=\"has-fixed-layout\"><tbody><tr><td>The operator&#8217;s room provided solutions to the following customer tasks:<\/td><td>Determining of mass flow rate of oil; Determining of volumetric flow rate of oil; Determining of oil density; Determining of moisture content in oil; Conducting control of metrological characteristics of Coriolis flowmeters using a stationary piston-tube verification unit (PTVU); Verification of a stationary PTVU using a reference unit (RU); Registration, storage and transmission of information to the telemetry system and SCADA.<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"902\" height=\"585\" src=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr8.jpg\" alt=\"\" class=\"wp-image-2562\" srcset=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr8.jpg 902w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr8-472x306.jpg 472w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr8-768x498.jpg 768w\" sizes=\"auto, (max-width: 902px) 100vw, 902px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Year: 2022 Implementation period: 14 months. Reconstruction of the circulating water supply system in terms of replacing the cooling tower for Uralskaya TPP of Zhaiykteploenergo JSC through the request of the Department of Housing and Public Utilities, Passenger Transport and Highways of Uralsk State Institution Location area: Kazakhstan, Mangistau region Scope of works: Development of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2562,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"single-realizovannye-proekty","format":"standard","meta":{"pgc_sgb_lightbox_settings":"","footnotes":""},"categories":[8],"tags":[],"class_list":["post-2559","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-realizovannye-proekty"],"_links":{"self":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2559","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/comments?post=2559"}],"version-history":[{"count":7,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2559\/revisions"}],"predecessor-version":[{"id":2892,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2559\/revisions\/2892"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media\/2562"}],"wp:attachment":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media?parent=2559"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/categories?post=2559"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/tags?post=2559"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}