{"id":2529,"date":"2025-07-22T13:48:50","date_gmt":"2025-07-22T10:48:50","guid":{"rendered":"https:\/\/west-oil.kz\/?p=2529"},"modified":"2025-08-12T14:20:31","modified_gmt":"2025-08-12T11:20:31","slug":"operatornaya-reaktornogo-cekha","status":"publish","type":"post","link":"https:\/\/west-oil.kz\/en\/realizovannye-proekty\/operatornaya-reaktornogo-cekha\/","title":{"rendered":"Loading and unloading operations control room Integrated control rooms (ICR)"},"content":{"rendered":"\n<div class=\"wp-block-group right-image has-global-padding is-layout-constrained wp-container-core-group-is-layout-bc757ebe wp-block-group-is-layout-constrained\" style=\"padding-right:0;padding-left:0\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-04822461 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column opisanie-proekta is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Loading and unloading operations control room Integrated control rooms (ICR)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">for Topan LLP<\/p>\n\n\n\n<figure class=\"wp-block-table d-none\"><table class=\"has-fixed-layout\"><tbody><tr><td>Location area:<\/td><td>Kazakhstan, Mangistau region, Aktau.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table d-none\"><table class=\"has-fixed-layout\"><tbody><tr><td>Scope of works:<\/td><td>Development of technical solution; Detailed design; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table d-none\"><table class=\"has-fixed-layout\"><tbody><tr><td>Brands that were used:<\/td><td>Siemens, Emerson,  \u041f\u043e\u0441\u0442\u0440\u043e\u0435\u043d\u0438\u0435 \u0441\u0438\u0441\u0442\u0435\u043c SCADA<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table d-none\"><table class=\"has-fixed-layout\"><tbody><tr><td>The system provided solutions to the following customer tasks:<\/td><td>Determination of volumetric flow rate of natural gas; Registration, storage and transmission of information to the telemetry system and SCADA.<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column period-realizacii is-layout-flow wp-block-column-is-layout-flow\">\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Year: <strong>2019<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Implementation period: <strong>2<\/strong> <strong>months.<\/strong><\/p>\n<\/blockquote>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"902\" height=\"585\" src=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr13.jpg\" alt=\"\" class=\"wp-image-2532\" srcset=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr13.jpg 902w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr13-472x306.jpg 472w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr13-768x498.jpg 768w\" sizes=\"auto, (max-width: 902px) 100vw, 902px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Loading and unloading operations control room Integrated control rooms (ICR) for Topan LLP Location area: Kazakhstan, Mangistau region, Aktau. Scope of works: Development of technical solution; Detailed design; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system. Brands that were used: Siemens, Emerson, \u041f\u043e\u0441\u0442\u0440\u043e\u0435\u043d\u0438\u0435 \u0441\u0438\u0441\u0442\u0435\u043c SCADA The system provided solutions [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2532,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"single-realizovannye-proekty","format":"standard","meta":{"pgc_sgb_lightbox_settings":"","footnotes":""},"categories":[8],"tags":[],"class_list":["post-2529","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-realizovannye-proekty"],"_links":{"self":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2529","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/comments?post=2529"}],"version-history":[{"count":9,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2529\/revisions"}],"predecessor-version":[{"id":2922,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2529\/revisions\/2922"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media\/2532"}],"wp:attachment":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media?parent=2529"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/categories?post=2529"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/tags?post=2529"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}