{"id":2461,"date":"2025-07-21T10:09:23","date_gmt":"2025-07-21T07:09:23","guid":{"rendered":"https:\/\/west-oil.kz\/?p=2461"},"modified":"2025-08-12T20:15:25","modified_gmt":"2025-08-12T17:15:25","slug":"ustanovka-zamera-debita-neftyanyh-skv","status":"publish","type":"post","link":"https:\/\/west-oil.kz\/en\/realizovannye-proekty\/ustanovka-zamera-debita-neftyanyh-skv\/","title":{"rendered":"Unit for measuring the flow rate of oil wells (UMFW)"},"content":{"rendered":"\n<div class=\"wp-block-group right-image has-global-padding is-layout-constrained wp-container-core-group-is-layout-bc757ebe wp-block-group-is-layout-constrained\" style=\"padding-right:0;padding-left:0\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-04822461 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column opisanie-proekta is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Unit for measuring the flow rate of oil wells (UMFW)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">for Phystech Firma LLP<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Location area:<\/td><td>Kazakhstan, Kyzylorda region, Kumkol deposit<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Scope of works:<\/td><td>Development of technical solution; Detailed design; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Brands that were used:<\/td><td>Endress+Hauser,Parker,Wika.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>The system provided solutions to the following customer tasks:<\/td><td>Determination of mass flow rate of gas and oil emulsion;<br>Determination of volumetric flow rate of gas and oil emulsion;<br>Determination of pressure, temperature, density; Conversion, storage and visualization of the listed parameters; The unit is mobile (based on a trailer).<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column period-realizacii is-layout-flow wp-block-column-is-layout-flow\">\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Year: <strong>2014<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Implementation period: <strong>5<\/strong> <strong>months.<\/strong><\/p>\n<\/blockquote>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"902\" height=\"585\" src=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr25-2.jpg\" alt=\"\" class=\"wp-image-2464\" srcset=\"https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr25-2.jpg 902w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr25-2-472x306.jpg 472w, https:\/\/west-oil.kz\/wp-content\/uploads\/2025\/07\/pr25-2-768x498.jpg 768w\" sizes=\"auto, (max-width: 902px) 100vw, 902px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Unit for measuring the flow rate of oil wells (UMFW) for Phystech Firma LLP Location area: Kazakhstan, Kyzylorda region, Kumkol deposit Scope of works: Development of technical solution; Detailed design; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system. Brands that were used: Endress+Hauser,Parker,Wika. The system provided solutions to the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2464,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"single-realizovannye-proekty","format":"standard","meta":{"pgc_sgb_lightbox_settings":"","footnotes":""},"categories":[8],"tags":[],"class_list":["post-2461","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-realizovannye-proekty"],"_links":{"self":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2461","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/comments?post=2461"}],"version-history":[{"count":5,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2461\/revisions"}],"predecessor-version":[{"id":2987,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/posts\/2461\/revisions\/2987"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media\/2464"}],"wp:attachment":[{"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/media?parent=2461"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/categories?post=2461"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/west-oil.kz\/en\/wp-json\/wp\/v2\/tags?post=2461"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}