Year: 2022
Implementation period: 14 months.
Reconstruction of the circulating water supply system in terms of replacing the cooling tower
for Uralskaya TPP of Zhaiykteploenergo JSC through the request of the Department of Housing and Public Utilities, Passenger Transport and Highways of Uralsk State Institution
Location area: | Kazakhstan, Mangistau region |
Scope of works: | Development of technical solution; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system. |
Brands that were used: | Emerson, Parker, Wika. |
The operator’s room provided solutions to the following customer tasks: | Determining of mass flow rate of oil; Determining of volumetric flow rate of oil; Determining of oil density; Determining of moisture content in oil; Conducting control of metrological characteristics of Coriolis flowmeters using a stationary piston-tube verification unit (PTVU); Verification of a stationary PTVU using a reference unit (RU); Registration, storage and transmission of information to the telemetry system and SCADA. |