Year: 2024
Implementation period: 8 months.
Automated group metering unit (AGMU)
15 units of AGMU direct contract with Ozenmunaigas JSC
Location area: | Kazakhstan, Mangistau region, Zhanaozen |
Scope of works: | Development of technical solution; Detailed design; Equipment supply; Engineering; Assembly and commissioning; Commissioning of the system. |
Brands that were used: | KROHNE, Schneider Electric, Wika. |
The operator’s room provided solutions to the following customer tasks: | Determination of mass flow rate of gas and oil emulsion; Determination of pressure, temperature, density; Conversion, storage and visualization of the listed parameters. |