Modernization of measuring instruments of TPP-1, TPP-2 and TPS gas metering units (1st stage)

Modernization of measuring instruments of TPP-1, TPP-2 and TPS gas metering units (1st stage)

for Mangistau Nuclear Power Plant LLP

Location area:Kazakhstan, Mangistau region, Aktau.
Scope of works:Development of technical solution; Detailed design; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system.
Brands that were used:Siemens, Emerson, Построение систем SCADA
The system provided solutions to the following customer tasks:Determination of volumetric flow rate of natural gas; Registration, storage and transmission of information to the telemetry system and SCADA.

Year: 2024

Implementation period: 12 months.