Year: 2013
Implementation period: 6 months.
Integrated control room (ICR)
for JV Kazgermunai LLP
Location area: | Kazakhstan, Atyrau region, Centralnyi Zhanatalap field, Zhaikmunaigas Oil and Gas Production Authority |
Scope of works: | Detailed design; Equipment supply; Engineering; Assembly and performance testing; Installation. |
Brands that were used: | Phoenix Contact, Schneider Electric, General Electric, IEK, Welan, Rittal, Building SCADA systems |
The operator’s room provided solutions to the following customer tasks: | Visualization of data from all field devices and equipment in real time; Remote control of process box equipment (valves, pumps, ventilation and heating); Uninterrupted and automated operation of analytical equipment in the process box; Generating and storing reports on process technological parameters with the ability to print out. |
