Year: 2011
Implementation period: 12 months.
Unit for analysis of gas quality (UAGQ)
for JV Kazgermunai LLP
Location area: | Kazakhstan, Kyzylorda region, Akshabulak field |
Scope of works: | Development of technical solution; Detailed design; Equipment supply; Engineering; Assembly and acceptance testing; Installation and commissioning; Commissioning of the system. |
Brands that were used: | Ametek, Birdwell, Ruffneck, Stahl, SGOES |
The operator’s room provided solutions to the following customer tasks: | Determination of dew point temperature for water; Determination of dew point temperature for hydrocarbons. |
